Yes, all Antifires fire rated glass and door assemblies are tested to BS 476 Part 22 and BS EN 1634-1, which are directly referenced by the Nigerian National Building Code (NBC) 2006 for fire resistance requirements. For Abuja projects, the Federal Capital Territory Development Control Department accepts these certifications as proof of compliance for egress paths and compartmentation. Antifires provides certified test reports for each product, including integrity (E) and insulation (I) ratings, ensuring that installations meet local enforcement standards. Products like the 28mm EI60 panel (integrity 66 min, insulation 64 min) and 50mm EI120 (integrity 120 min, insulation 120 min) are designed to align with NBC’s fire resistance level (FRL) specifications for commercial buildings.
Standard lead time for fire rated glass delivery to Abuja is 10 to 15 working days from our Lagos warehouse, depending on order volume and product configuration. Antifires does not offer direct on-site installation but provides comprehensive technical documentation, including installation drawings and guidelines for frame assembly, ceramic wool packing (3–6mm), and intumescent seal placement. Contractors in Abuja can rely on these resources to ensure proper installation in compliance with BS 476 test conditions. For urgent projects, expedited shipping options are available upon request. All shipments include certified test reports to facilitate inspection by local fire service authorities.
To select the correct fire rating for a glazed partition in an Abuja commercial building, first determine the building’s occupancy class and compartment size per the Nigerian National Building Code (NBC). For a typical office corridor requiring 60-minute protection, an EI60 rated assembly (e.g., 28mm panel with integrity 66 min and insulation 64 min) is suitable. For stairwell enclosures in high-rise buildings, a 90- to 120-minute rating (e.g., 50mm EI120) may be mandated. Antifires provides a product selection guide based on fire resistance level (FRL) requirements, helping contractors match glass thickness, frame specifications, and sealant materials to project-specific needs. Certified test data is available for each option to support approval by the Abuja Environmental Protection Board (AEPB).