Yes, Antifires fire-rated glass complies with Sweden’s BBR 29 and EN 1364 standards, ensuring full acceptance for Uppsala building permits. All products undergo rigorous testing under BS EN 1364-1 and BS 476 Part 22, with certified ratings from EI 30 to EI 120. For example, the 28mm EI60 panel achieves 66 minutes of integrity and 64 minutes of insulation, meeting BBR’s fire compartmentation requirements for residential and commercial buildings. Antifires provides comprehensive test reports and declarations of performance, which are accepted by Uppsala’s building control authorities. The company also offers localized support to help architects and contractors navigate the permit process, ensuring all documentation aligns with Swedish National Board of Housing regulations. For projects requiring specific heritage or acoustic adaptations, custom assemblies can be engineered while maintaining full BBR compliance.
Yes, Antifires can supply EI 60 fire-rated doors and windows for Uppsala’s historic buildings without altering original wooden frames. The 28mm EI60 glass (integrity 66 min, insulation 64 min) is designed for retrofitting into existing frames using ceramic tape (3–6mm thickness, density 210 kg/m³) and expansion gaps (3–5mm) filled with ceramic fiber. This system preserves the aesthetic integrity of heritage structures, such as those in Gamla Uppsala, while meeting BBR’s fire resistance standards. The glass can be installed with intumescent seals (20mm × 4mm) to maintain insulation performance. Antifires also provides on-site technical guidance to ensure proper fitment without compromising the original facade. For larger openings, custom sizes are available, and all assemblies are tested under BS EN 1634-1 to guarantee EI 60 performance in historic contexts.
Typical lead time for custom fire-rated glass orders delivered to Uppsala construction sites is 4–6 weeks from order confirmation. This includes fabrication, quality testing, and packaging for safe transport. For standard sizes, such as 10mm FPOS or 21mm FPOS glass, lead time can be reduced to 2–3 weeks. Antifires coordinates with logistics partners to ensure timely delivery to Uppsala’s urban and suburban projects, including Rosendal and Gränby. For urgent requirements, expedited production may be available upon request. All shipments include full documentation, including test certificates and installation manuals, to support smooth on-site integration. Clients are advised to place orders at least 8 weeks before planned installation to accommodate custom specifications, such as heritage frame adaptations or acoustic enhancements, ensuring compliance with BBR 29 and Uppsala’s building schedules.